Wednesday, October 24, 2007

In the beginning....


Power meters were finally installed this morning.



Concrete to be completed next week. Setting up all the table and chairs. Two steps have been incorporated in the design as the right side of block has 1 metre drop to South East corner.

Tanks and stuff are set up ready for install.

Aaron

No comments: